Install Checklist
Install Checklist
Created By
*
PO #
*
Type of Work
*
Install
Repair
Property Information
Address
*
Subdivision
*
Builder
*
C.M.
*
Crew
*
Completion Dates
Irrigation
Landscape
To Office
*
Irrigation Checklist
Work Completed
Clock Time Set
Zone Time Set
No Heads Covered by Sod
Confirm Every Zone Operational
System Flush if Needed
Note: Items INCOMPLETE before Install
Landscape Checklist
Work Completed
Sod Tightly Laid
Plants Spaced Correctly
Trees Straight & Staked
Mulch Depth Correct
Yard Rolled
Job Site Clean
Landscape Notes
Install Count
Section
Irrigation - Zones
RPZ Cover
Installed
Gutter Downspout
Sleeves
Sod - Pallets
Tree - 30 Gallon
Tree - 45 Gallon
Tree - 65 Gallon
Tree - 100 Gallon
Decomp Granite - Ydz
River Rock - Ydz
Other Material
Material 1 Count
Material 2
Material 2 Count
Section
Plants - 1 Gallon
Plants - 3 Gallon
Plants - 5 Gallon
Plants - 10 Gallon
Tree - 15 Gal ORN
Tree - 30 Gal ORN
Brown Mulch
Black Mulch
Other Material
Material 1 Count
Material 2
Material 2 Count
Additional Notes
Visual
Text
File Upload
Drop a file here or click to upload
Choose File
Maximum upload size: 20MB
Submit
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel